Airlab_Banner_FactsNotOpinionsGiven today’s sophisticated building systems, tight construction budgets and short construction timelines, owners need to use the commissioning process to help deliver buildings that perform as intended. Pre-commissioning checks are an important part of the commissioning process of a building and allow for a smooth transition to the testing phase of the program.

They can be included in or required by the commissioning plan. These could be stand alone for individual equipment/systems, and/or include essential elements of the Commissioning Test/Inspection Plans.

The benefits of pre-commissioning the HVAC system are:

  • Ensure the installation is per the contract design.
  • Identify problems and resolve issues prior to the commencement of testing.
  • Easier and cost effective to remedy issues at the start of project rather than during commissioning.
  • Early resolution of problems reduces delays in commissioning and the overall project program.

The pre-commissioning checklists are not intended to replace the mechanical contractors own QA checks.

 

Click the PDF you wish to download:

Airlab_checklist_AHU
Air Handling Unit
Airlab_checklist_CoolingTower
Cooling Tower
Airlab_checklist_Fan
Fan
Airlab_checklist_FCU
Fan Coil Unit
Airlab_checklist_HeatExchanger
Heat Exchanger
Airlab_checklist_Pump
Pump
Airlab_checklist_ReheatCoils
Reheat Coils
Airlab_checklist_VAV
Variable Air Volume Unit